1、 Project Overview
This project is located in the UnionPay data center of Building B of Jixian Center in Pudong, Shanghai. It belongs to the financial core office park and is equipped with a staff logistics and living hot water system. Financial data centers have strict requirements for equipment operation stability, low noise, safety protection, and long-term energy efficiency. It is necessary to ensure stable water supply throughout working days, and equipment operation must not interfere with precision equipment in the data center. At the same time, low-carbon and environmentally friendly operation standards should be taken into account.
The final configuration of the project includes four free energy 99KW 400L gas volumetric water heaters, using a multi machine parallel modular water supply scheme. Each unit has a 400L large capacity pressure bearing inner tank and a 99KW high-power heating output, which can flexibly adjust the number of operating units. The off peak start stop is adapted to the peak water consumption of the park in the morning and evening, ensuring uninterrupted supply of hot water for showering, washing and daily life for all employees in the building. The entire system has completed on-site installation, pipeline docking, machine debugging and acceptance work, and has been officially put into normal operation.
2、 Core Adaptation Advantages of Project Selection
99KW high power+400L large capacity water storage, suitable for centralized water use in industrial parks
The rated thermal load of a single device is 99KW, with a 400L integrated pressurized water storage tank that does not require an additional external water tank. The machine room occupies a small area and is perfectly adapted to the compact equipment room space of data centers; Four parallel combinations can flexibly adjust the operating load, automatically reduce the load and shut down during low water usage periods, significantly reducing no-load gas losses. They can start synchronously during peak water usage periods in the morning and evening, with constant water temperature and no sudden cooling or heating, meeting the multi-point synchronous water demand of the entire building.
Multiple security protections, matched with high standard control of financial data centers
The whole machine is equipped with multiple safety programs such as flameout protection, over temperature and over pressure protection, anti freezing, anti dry burning, and air leakage interlock cut-off. The combustion and smoke exhaust are stable and sealed, and the low-noise variable frequency fan operates without vibration or noise, which will not interfere with the operation of precision server equipment in the data center; The whole machine has no risk of open flame overflow, complies with the fire safety acceptance standards for financial buildings, does not require dedicated boiler duty, and the intelligent automatic control system automatically inspects the operating status.
Venturi adiabatic expansion fire tube heat transfer+graphene silicon nano enamel inner liner
The unique Venturi adiabatic expansion effect fire tube heat transfer structure ensures sufficient heat transfer, long-term thermal efficiency does not decrease, gas combustion is more complete, and operating energy consumption is lower; The inner liner adopts graphene silicon nano enamel technology, which is resistant to scale and corrosion, suitable for long-term continuous operation of municipal tap water, greatly extending the service life of the whole machine, reducing the impact of frequent maintenance on the hot water supply in the park, and lowering long-term operation and maintenance costs.
Modular parallel operation and maintenance, uninterrupted water supply for maintenance
Four independent units operate in parallel, and the remaining three can continue to supply water normally during maintenance and repair of a single device, without causing a complete interruption of hot water supply to the entire building. It is suitable for the uninterrupted office needs of the financial park throughout the year and ensures uninterrupted logistics services.
3、 Project implementation effectiveness
After the completion of the entire hot water system debugging, all operating parameters meet the standard, the water supply temperature is stable and controllable, and the load adjustment response for start stop is rapid.
Water supply guarantee: a combination of 4 99KW400L units, fully covering the daily hot water needs of all employees in the UnionPay data center building;
Energy saving operation: Modular time-sharing start stop design significantly reduces comprehensive gas energy consumption compared to traditional large boilers;
Worry free operation and maintenance: The enamel inner liner is resistant to scale and has low failure frequency, with intelligent remote monitoring of operating status and convenient after-sales operation and maintenance;
Scenario adaptation: Low noise, safe, small footprint, meeting the strict environmental control standards of financial data center rooms, becoming a benchmark case for commercial hot water in financial office parks.
4、 Applicable scenario reference
The free energy 99KW400L gas volumetric water heater is widely suitable for large and medium-sized centralized domestic hot water projects such as financial data centers, office buildings and parks, corporate headquarters, hotel apartments, hospitals, factory dormitories, etc. It can provide 2-10 multi machine parallel customized water supply solutions according to the water consumption scale.