6.1 Pre-Installation Preparation

·Confirm gas type: natural gas (2000~2500 Pa) or liquefied gas (2800~4000 Pa)

·Confirm power supply: 220V, reserve a dedicated circuit

·Confirm positions of water supply inlet, outlet, and drain

·Confirm flue route and wall opening position for external discharge

·Equipment foundation load-bearing capacity meets requirements (unit weight+operating weight)

6.2 Key Interface Parameters

Taking a typical commercial volumetric gas water heater as an example:

Interface

Common Specification

Description

Water Inlet

DN25 / DN40

Varies by model

Water Outlet

DN25 / DN40

Matched with water inlet

Flue Outlet

φ60 / φ110

Flue pipes must be configured per manufacturer requirements

Gas Connection

DN15 / DN20

Gas valve and filter must be installed

6.3 Key Control Points During Installation

1. Flue installation: Must be independently routed outdoors; sharing with kitchen exhaust ducts is prohibited

2. Gas piping: Leak-tightness test must be performed after installation

3. Water piping connection: Install a pressure-reducing valve or expansion tank at the water inlet to prevent water hammer

4. Electrical grounding: The equipment must be reliably grounded

5. Ventilation requirements: Air exchange rate in the equipment room must be no less than 6 times/hour

6.4 Commissioning and Acceptance Checklist

·Ignition is normal, flame is stable, no deflagration

·Outlet water temperature reaches the set value

·Start-up under low water pressure is normal

·Safety protection functions pass testing

·Flue is well sealed, and exhaust emissions are normal

·User training and handover documentation are complete

The installation quality of a volumetric gas water heater directly affects the equipment's safety, operating efficiency, and service life. The following are key considerations that must be addressed during installation:

1. Equipment Room Location and Space Requirements:

●The equipment should be installed in a well-ventilated dedicated equipment room. Installation in enclosed spaces such as bedrooms, bathrooms, or basements is strictly prohibited.

●The area and height of the equipment room must meet the equipment dimensions and maintenance access requirements. At least60cm of operating space must be reserved around the equipment.

●The floor must be level and sturdy, capable of bearing the equipment's operating weight (the weight with water is far greater than the empty weight; the floor load-bearing capacity must be verified in advance).

2. Flue and Exhaust System:

●Fully premixed condensing equipment uses forced exhaust. The flue material should be acid-resistant stainless steel orPP material (condensate is weakly acidic).

●The flue route should be as short and straight as possible, with fewer elbows. Horizontal sections should maintain a downward slope to allow condensate to drain out.

●The exhaust outlet should be kept away from fresh air intakes and windows to prevent exhaust gas recirculation.

3. Gas Piping:

●The gas pipe diameter must be precisely calculated based on the equipment's rated power and piping length to ensure a stable gas supply pressure within the equipment's required range.

●All pipe connections must undergo leak-tightness testing; leaks are strictly prohibited.

●It is recommended to install a gas filter and emergency shut-off valve upstream of the equipment.

4. Water System:

●AY-type strainer should be installed on the inlet water line to prevent impurities from entering the equipment.

●A check valve and safety relief valve are recommended on the outlet water line.

●The condensate drain line must be connected to the drainage system, and the trap must be properly sealed to prevent flue gas backflow.

●For areas with hard water, it is recommended to install a water softening system to extend equipment life. Although Free Energy's graphene silicon nano cold-enamel inner tank already offers excellent scale resistance, proper water treatment is still a valuable enhancement.

5. Electrical and Control:

●The equipment must be powered by a dedicated circuit with reliable grounding.

●The control panel should be installed in a location that is convenient for daily operation and observation.

●If remote monitoring is required, reserve communication line interfaces in advance.

6. Commissioning and Acceptance:

●After installation, the first ignition and commissioning must be performed by certified professionals to verify combustion status, water temperature stability, and the proper functioning of safety protection devices.

●Record initial operating parameters as baseline data for future maintenance.

●Deliver the complete user manual and maintenance handbook to the customer.

Special Reminder:Volumetric gas water heaters fall under the category of special equipment, and installation must be carried out by qualified units and personnel with the appropriate certifications. Reputable manufacturers such as Free Energy typically provide standardized installation guidance and technical support services. It is recommended to fully communicate with the manufacturer before installation to ensure that every step complies with regulatory requirements.