Chongqing Armed Police Training Unit Hot Water Engineering Project Case

I. Project Overview

The Armed Police Training Unit has high daily training intensity and concentrated personnel. 800 officers and soldiers take showers centrally after training, with highly concentrated water usage time and extremely large instantaneous water consumption. The hot water system must meet extremely high military-standard requirements forrapid supplemental heating, constant temperature and stable pressure, all-weather stable water supply, safety and durability. The military camp scenario imposes stringent requirements on equipment operation and maintenance, requiring a balance of high efficiency and energy saving, low-noise operation, low failure rate, and convenient maintenance.
Based on on-site water usage conditions and peak load calculations, the project ultimately adopted acombined centralized hot water system of 3 Free Energy 99KW/180L semi-volumetric gas water heaters + 30-ton constant-temperature insulated water storage tank. The system utilizes rapid heating and energy storage of the units combined with a large-capacity tank for peak shaving and heat storage, perfectly adapting to the high-intensity water usage scenario of hundreds of people showering simultaneously. Currently, the entire set of equipment has completed on-site installation, pipeline commissioning, and system linkage testing, and has been fully put into normalized stable operation. Photos of the equipment room installation are as follows:
(Insert on-site installation photos)

II. Solution Selection Advantages (Adapted to Military Camp Specialized Water Usage Scenarios)

This project adopts Free Energy semi-volumetric gas water heaters, equipped with the model's proprietary core technologies:Venturi adiabatic expansion effect fire-tube heat exchange system + graphene silicon nano enamel liner process, specifically developed for large-flow centralized water usage scenarios, adapted to the high-intensity, uninterrupted water demands of military camps.

1. Unit + large tank combination, completely solving peak water shortage

A single 99KW high-power unit provides rapid heating, with a 180L built-in water storage chamber for quick heat storage. Three units operate in parallel linkage, combined with a 30-ton large-capacity constant-temperature insulated water tank, forming a dual guarantee of "instant heating + large-capacity heat storage". It can easily handle the instantaneous water load of 800 officers and soldiers taking centralized training showers, eliminating problems such as sudden water temperature drops during peak hours, insufficient outlet pressure, and hot water supply interruption. The entire process maintains constant temperature and stable pressure water supply, fully meeting military-standard water usage requirements.

2. Exclusive core heat exchange technology, high efficiency and energy saving, extremely low thermal衰减

The equipment adopts a patented Venturi adiabatic expansion effect fire-tube heat exchange structure, optimizing heat exchange efficiency through fluid dynamics principles, with fast heating speed, sufficient heat exchange, and no obvious thermal decay during long-term operation. It is equipped with a graphene silicon nano enamel liner, which is corrosion-resistant, scale-resistant, and prevents enamel cracking and peeling, adapting to the long-term high-frequency start-stop military camp operating conditions. The equipment has a longer service life, significantly reducing later replacement and maintenance costs.

3. Intelligent linkage temperature control, adapted to military camp daily routines

The entire system supports intelligent group control linkage of multiple units, automatically adjusting unit start-stop and load output according to military camp schedules and water usage peak and valley periods. During training water usage peaks, all units operate at full load for supplemental heating; during nighttime low peaks, the system automatically switches to constant-temperature insulation mode, reducing ineffective energy consumption and idle operation of equipment, balancing water supply stability and energy efficiency, and adapting to the standardized and refined logistics management needs of military camps.

4. Safe, stable, low-noise operation, adapted to enclosed military camp scenarios

The equipment operates with low noise and stable working conditions, with low-nitrogen and environmentally friendly emissions, conforming to military green and safe construction standards. The overall structure is sturdy with strong protection capability, adapted to enclosed military camp fixed equipment room installation environments. The fault self-diagnosis function enables quick problem identification, making logistics operation and maintenance simple with a low failure rate, ensuring uninterrupted stable water supply throughout the year.

III. Project Implementation Results

After project implementation, the previous problems of insufficient hot water supply, unstable water temperature, and high energy consumption of the Chongqing Armed Police Training Unit were completely resolved. The combined solution of 3 semi-volumetric hot water boilers with a 30-ton heat storage tank perfectly matches the high-intensity water usage demands of officers and soldiers taking centralized training showers. The outlet water temperature is constant and stable, the water supply is continuous and sufficient, the equipment operates smoothly, and the energy-saving effect is remarkable. The entire system highly conforms to the military's safety, stability, long-term effectiveness, and energy-saving logistics support requirements, becoming a high-quality benchmark case for centralized hot water supply in military and police units.

5b89bfc70b110532a6a3a7eb43e1e883.jpg662eb218aadd638f59da909892cd7742.jpgf4ab02ee08e87721d245852061204105.jpgc2878e7389f61cdeab1fa8322e8f2fa8.jpg3df1382911a10c572e97c467352c0cc0.jpg

Name:
Message:
Verification code:
Submit
Comment
contact us
电话 18038757576
QQ 453457997
微信
扫码咨询