Hot Water Project Case for Student Dormitories in the New Campus of Liaoyang County First Senior High School
I. Project Overview
The new campus of Liaoyang County First Senior High School is a key newly built modern high-standard campus in the local area. The campus has a large enrollment scale and a large number of boarding students. The bathing water demand for student dormitories is characterized byconcentrated user numbers, highly concentrated time periods, heavy load during morning and evening peaks, and year-round uninterrupted use. The campus hot water system imposes extremely high educational logistics standards on equipment operational stability, safety, durability, low noise, low maintenance, and constant-temperature water output, and must ensure comfortable, stable, and zero-failure operation for tens of thousands of teachers and students in their daily bathing water use.
Taking into account the overall planning of the new campus, dormitory layout, peak water consumption estimation, and campus safety management regulations, the school ultimately procured in bulk14 Ziyou Neng (Free Energy) 99KW/320L atmospheric forced-exhaust gas volume-type water heaters, adopting a multi-unit zoned parallel centralized water supply model to fully cover the bathing and sanitary hot water needs of all student dormitories in the new campus. All equipment has completed standardized on-site installation, pipeline matching and commissioning, and safety acceptance, and is now officially in normal and stable operation on campus. The on-site photos of the equipment room are as follows:
(Insert on-site installation photos)
II. Core Advantages of the Solution Selection
This project adopts the Ziyou Neng (Free Energy) atmospheric forced-exhaust volume-type model, equipped with the exclusive core technology of volume-type water heaters:Venturi adiabatic expansion effect fire-tube heat exchange system + graphene silicon nano enamel liner technology, specifically tailored for schools' high-frequency concentrated water use and long-term continuous operation conditions.
1. Atmospheric forced-exhaust structure, safer and more stable for campus use
A campus is a densely populated place, and equipment safety is the first standard. The atmospheric forced-exhaust model selected this time ensures complete combustion, smooth flue gas discharge, and stable exhaust, eliminating hidden dangers such as negative-pressure backdraft and incomplete combustion. The entire unit is equipped with multiple safety protections including over-temperature protection, over-pressure protection, flame failure protection, and anti-dry-burning protection, operating stably with low noise, fully meeting the new campus safety construction standards and suitable for uninterrupted long-term use in student dormitories.
2. Graphene silicon nano enamel liner, durable and corrosion-resistant for high-frequency campus water use
In response to the characteristics of concentrated morning and evening water use, large temperature differences between hot and cold water, and frequent start-stop cycles, the equipment adopts a graphene silicon nano special enamel liner with a dense coating and strong adhesion, resistant to scale buildup, acid and alkali corrosion, and thermal shock. It is not prone to enamel peeling, rusting, or leaking even under long-term high-frequency use, thoroughly avoiding the common problems of traditional water heaters in campus use that tend to leak or malfunction within 2-3 years, significantly reducing the school's logistics maintenance costs and water outage risks.
3. Venturi fire-tube high-efficiency heat exchange, rapid heat replenishment during peaks without temperature drop
Equipped with the patented Venturi adiabatic expansion fire-tube heat exchange structure, it offers a large heat exchange area, high heat exchange efficiency, and resistance to ash accumulation and blockage, with no attenuation in thermal efficiency during long-term operation. With 14 units connected in parallel by zone, each with 99KW high-power rapid heating and 320L large-volume heat storage, it perfectly handles the two major water usage peaks after evening self-study and morning washing for the entire school, delivering constant-temperature and stable water output with sufficient water volume, thoroughly solving the common campus hot water problems of "low water temperature during peak periods, small water output, and interrupted hot water supply".
4. Multi-unit intelligent zoned linkage control, adapted to campus schedules for energy-saving operation
The entire system supports intelligent linkage control of multiple units, automatically adjusting unit start-stop and load output according to campus schedules and water usage peaks and valleys. During low-peak daytime periods, units automatically enter standby sleep mode with low-consumption heat preservation; during evening water usage peaks, all units automatically operate at full load for heat replenishment. Operating on demand with intelligent energy savings, it effectively reduces the school's gas operation energy consumption and is suitable for refined campus logistics management models.
5. Integrated one-piece design, simple installation and easy maintenance
The equipment features an integrated volume-type structure with a built-in water storage liner, requiring no additional large water tank. The equipment room layout is neat, the construction period is short, and later maintenance is simple. The units have a low failure rate, stable operation, and require no frequent on-site inspection, greatly reducing the school's logistics operation and maintenance pressure, and meeting the standardized, modern campus supporting construction requirements of the new campus.
III. Project Implementation Results
By batch-installing 14 Ziyou Neng (Free Energy) 99KW/320L atmospheric forced-exhaust volume-type gas water heaters, the new campus of Liaoyang County First Senior High School has built asafe and stable, constant-temperature and comfortable, energy-saving and durable, low-maintenancecampus centralized hot water system. The equipment perfectly adapts to the high-flow, centralized, year-round non-stop water usage conditions of boarding schools, effectively guaranteeing the daily bathing water experience of all students in the school. With stable equipment operation and good user feedback, it has become a benchmark project for hot water supporting facilities in newly built key senior high schools in Liaoyang County.