Delivery Cycle
| Product Type | Standard Model | Custom Model |
|----------|----------|----------|
| Storage Water Heater | 3-5 days | 10-15 days |
| Modular Boiler | 5-7 days | 15-20 days |
| Steam Generator | 7-10 days | 20-25 days |
**Logistics Methods**
- Single unit: Deppon/Aneng logistics, door-to-door delivery
- Multiple units/large equipment: dedicated line logistics, self-pickup or additional delivery fee required
- Urgent orders: air freight available (additional cost)
**Packaging**
- Wooden case packaging, moisture-proof and shock-resistant
- Includes factory inspection report, certificate of conformity, and instruction manual
- Includes installation accessory kit (valves, pipe fittings, etc.)
**Shipping Cost**: Free shipping within Guangdong Province; for other provinces, calculated based on distance and weight, generally ¥300-¥1000.